projects in mathematics
Assessing Projects.
The project work should be done in a separate book from normal class work.
Insist on high standards and you will get them.
I assess projects on a graded system of
A+, A, A-, B+, B, B-, C.
A+ is outstanding with extra relevant material added
A is excellent, well presented, answers correct but nothing extra attempted
A- is very good but not enough detail although answers are correct
B+ is ok, a bit untidy but with most of the answers correct
B is a bit rough but a good attempt
B- is not all there, an attempt though
C is unsatisfactory!
These grades can be converted into marks when needed.
A+ = 10, A = 8, A-=6, B+=4, B=2, B-=0, C= redo!
I add the marks without scaling to the student's total marks of exams and tests for the year. This is an added incentive!
On the student's report there is a space to enter a project mark or rating.
To print this page point the curser on a clear space on the right hand side of the page to be printed. Now right click and the print button should appear. Activate this.
If it does not appear then move the curser to another part of the page and right click again.
|